Sign In | Join Free | My chinacsw.com |
|
Brand Name : Harzone
Place of Origin : China
MOQ : negotiation
Payment Terms : According to detailed order
Delivery Time : negotiation
Packaging Details : According to detailed order
Material : Steel bridge
Feature : Reusable
Capacity : Heavy loading capacity
Structure : Simple
Status : Sefl Fold and Unfold
22.5m Aluminum Alloy Mechanized Bridge Emergency Equipment wifi network bridge
Light Mountain Bridge is mostly used to erect an emergency bridge for all varieties of weaponries and vehicles to get across watercourses, trenches, ditches, craters or other obstacles not wider than 20.5m.
It can be used in plateau (with boost engine and oil adapted), mountain area, plain and paddy field area.
Specification for Light Mountain Bridge |
|
Allowable bank height difference | 2.0m |
Folded outline dimension (L*W*H) | 10960*3200*3640mm |
Gross weight | 21.8t |
Tracked load / Axle load | 22t / 10t |
Bridge weight | 6.5t |
Bridge length | 22.5m |
Negotiating width (on hard banks) | 20.5m |
Section length | 7.5m |
Roadway width | 3.2m |
Track girder width | 1.16m |
Erection / Retrieval time | 10/10 mim |
Max. twist in erection | ±5% |
Operator | 3 operators |
![]() |
Watercourses 22.5m Aluminum Alloy Mechanized Bridge Images |